  1. What will you be able to do by the end of this training?
  2. Lesson 1: What is the reorder point?
  3. Lesson 2: How is the daily sales rate measured?
  4. Lesson 3: How are lead time and safety margin determined?
  5. Lesson 4: How is the reorder point calculated?
  6. Lesson 5: What is the stock position and how is the ordering decision made?
  7. Lesson 6: How is the order quantity determined?
  8. Lesson 7: How is the point updated for campaigns and seasons, and what does a mistake cost?
  9. Lesson 8: How is the reorder point monitored?
  10. What are the most common mistakes when calculating the reorder point?
  11. How does NetKasam make reorder point tracking easier?
  12. Mini quiz: Test what you have learned
  13. Conclusion: Place the order when stock hits the point, not when it runs out
  14. Frequently Asked Questions About the Reorder Point

Placing a supplier order when stock has run out is too late, because the product arrives days or even weeks after the order and sales stop during that time. Ordering too early is just as harmful: the warehouse fills up and cash is tied up. The reorder point is the stock level that shows the right moment between these two mistakes: when stock falls to this quantity you place the order, and the new product arrives before stock runs out.

This article is not a narrative but an 8-lesson hands-on tutorial. We will answer how to calculate the reorder point through three sample products: measuring the sales rate, lead time and safety margin, the reorder point formula, the ordering decision based on stock position, the order quantity, updating for campaigns and seasons, the cost of late and excess ordering, and tracking indicators. At the end there is a mini quiz with an answer key. All figures are sample values chosen to demonstrate the method; follow the same steps with your own data.

What will you be able to do by the end of this training?

In short: You will measure your products' sales rate and lead time, calculate the reorder point and decide when and how much to order based on the stock position.

Tutorial mapThe six steps of finding the reorder point
  1. 01
    MeasureFind the average daily sales rate.
  2. 02
    Set the timeWrite the average and longest lead time.
  3. 03
    Add marginCalculate the safety margin.
  4. 04
    CalculateWork out the reorder point.
  5. 05
    CompareCompare the stock position with the point.
  6. 06
    OrderOrder up to the target stock for products that have hit the point.

The 8 lessons of the tutorial: (1) what the reorder point is, (2) sales rate, (3) lead time and safety margin, (4) formula and calculation, (5) stock position and ordering decision, (6) order quantity, (7) updating for campaigns and seasons and the cost of mistakes, (8) tracking indicators.

Lesson 1: What is the reorder point?

In short: The reorder point is the stock level at which a supplier order should be placed when stock falls to that quantity. It ensures stock does not run out when the order arrives.

The logic is simple. Sales continue during the time from when you place the order until the product arrives (the lead time). If you order while stock equal to the quantity to be sold during that time remains, the new product arrives just as stock runs out. Because sales may be faster than expected or supply may take longer than expected, a safety margin is added to this quantity. For the general logic of safety stock, see how to calculate safety stock; this article calculates the same margin with a simple method and puts it inside the reorder point.

The reorder point tells you when to order; you determine how much to order separately (Lesson 6). For cases with no history, such as the first order quantity for a new product, see how to determine the first order quantity for a new product.

Lesson 2: How is the daily sales rate measured?

In short: Divide the total sales of the last eight weeks by the number of days; treat campaign days and days out of stock separately.

FormulaReorder point formulas
  1. Daily sales rate = Period sales ÷ Number of days in the period
  2. Safety margin = (Longest lead time − Average lead time) × Daily sales rate
  3. Reorder point = Daily sales rate × Average lead time + Safety margin

Sample product X sold 672 units in the last 8 weeks (56 days): daily sales are 672 ÷ 56 = 12 units. Campaign days and days when sales were impossible because the product was out of stock should not be included in the calculation; the first shows the rate higher than it is, the second lower than it is. To forecast sales, you can use the methods in how to forecast sales; track the accuracy of the forecast with how to measure sales forecast accuracy.

The sales rate is not measured over the same period for all products: the last 4-8 weeks gives more balanced results for fast products, and the last 12-16 weeks for slow ones. To classify products and decide how often to check them, see how to do ABC analysis.

Lesson 3: How are lead time and safety margin determined?

In short: Lead time is the number of days from placing the order to the product reaching the shelf. Measure the average and longest time from recent orders; multiply the difference by the sales rate to find the safety margin.

Lead time is not only the supplier's preparation time: it is the sum of order confirmation, preparation, transport, goods receipt and shelving time. For the goods receipt side, see how to do goods receipt. You track suppliers' consistency of lead time with how to measure supplier performance; for a supplier whose lead time varies a lot, the safety margin grows.

ProductDaily salesAverage lead timeLongest lead timeSafety margin
Product X12 units9 days12 days(12 − 9) × 12 = 36 units
Product Y5 units14 days17 days(17 − 14) × 5 = 15 units
Product Z2 units21 days26 days(26 − 21) × 2 = 10 units

This method is a simple safety margin: it protects against supplier delay but not against a sudden rise in sales. If sales fluctuate, use the statistical method in the safety stock article. The simple method is enough as a first step for most businesses and is calculated separately for each product.

Lesson 4: How is the reorder point calculated?

In short: Multiply the daily sales rate by the average lead time and add the safety margin.

ProductSales during lead timeSafety marginReorder point
Product X12 × 9 = 10836144 units
Product Y5 × 14 = 701585 units
Product Z2 × 21 = 421052 units
ChartComponents of Product X's reorder point
  • Units sold during lead time₺10875%
  • Safety margin₺3625%

Prepared with sample values. Total: 108 + 36 = 144 units.

ChartThe reorder point differs greatly by product: sales rate and lead time determine it
  1. Product X (12 units/day, 9 days)144 units
  2. Product Y (5 units/day, 14 days)85 units
  3. Product Z (2 units/day, 21 days)52 units

Prepared with sample values. Point = daily sales × average lead time + safety margin.

Even though Z's sales are one sixth of X's, its point is not low because its lead time is long. Slow products with long lead times running out is often the problem noticed last. In NetKasam you can enter the reorder point as the product's critical stock quantity; when stock drops to that quantity the system sends a notification (inventory management).

Recommended readingHow to Calculate Safety Stock?

Lesson 5: What is the stock position and how is the ordering decision made?

In short: The decision is made on the stock position, not on the stock counted on the shelf: on-hand stock + orders in transit − orders reserved for customers (pending).

Stock on the shelf is misleading: if there is an order on the way, ordering a second time creates excess stock; if there are products reserved for customers but not yet shipped, the quantity on the shelf is not sellable. That is why the comparison is made with the stock position.

ChartProduct X's stock position: 125 units
  1. On-hand stock counted on the shelf150 units
  2. Pending orders reserved for customers−25 units
  3. Stock position (no order in transit)125 units

Prepared with sample values. Calculation: 150 + 0 − 25 = 125 units.

ProductStock positionReorder pointDecisionDays of coverage
Product X125144Order (below the point)125 ÷ 12 = 10.4 days
Product Y9585Wait (above the point)95 ÷ 5 = 19 days
Product Z4852Order (below the point)48 ÷ 2 = 24 days

X's stock will last 10.4 days and the lead time is 9 days; that is, if no order is placed today, the new product cannot arrive before stock runs out. Reading days of coverage and lead time side by side makes the decision clear. To verify stock by counting it on the shelf, see how to do a stock count, and to monitor how fast stock turns over, see how to calculate inventory turnover.

Lesson 6: How is the order quantity determined?

In short: The order quantity is found by subtracting the stock position from the target stock level. The target level is the sum of the units to be sold over the order interval and the lead time, plus the safety margin.

FormulaOrder quantity calculation
  1. Target stock level = Daily sales × (Lead time + Order interval) + Safety margin
  2. Order quantity = Target stock level − Stock position

For product X the order interval is 21 days (an order is placed every three weeks). The target stock level is 12 × (9 + 21) + 36 = 12 × 30 + 36 = 396 units. Since the stock position is 125, the order quantity is 396 − 125 = 271 units. If the supplier has a minimum order quantity or case multiple, the quantity is rounded up accordingly.

The factors that determine the order interval are the supplier's minimum quantity, shipping cost, cash position and warehouse capacity. As the interval lengthens, the number of orders and shipping cost fall but average stock and tied-up cash rise. To plan supplier payments, see how to plan supplier payments, because the cash effect of a high-quantity order depends on the payment date.

Lesson 7: How is the point updated for campaigns and seasons, and what does a mistake cost?

In short: When the sales rate changes, the point changes too. Before campaigns and seasons, recalculate the point for the new rate; ordering late loses sales, ordering excess ties up cash.

In the campaign, product X's daily sales rise from 12 to 18. The safety margin is (12 − 9) × 18 = 54, and the point becomes 18 × 9 + 54 = 162 + 54 = 216 units; that is 72 units above the normal point (144). A business that does not update the point notices the stock running out far too late once the campaign starts. For campaign preparation, see how to prepare for a busy campaign period, and for seasonal products, how to plan seasonal product stock.

MistakeAccountCost
Placing the order 3 days late (Product X)3 days × 12 units = 36 units cannot be sold; if the unit contribution margin is ₺80, then 36 × 80₺2,880 lost profit
Buying 30 days more stock than needed (Product X)30 days × 12 = 360 extra units; if the purchase cost is ₺150, then 360 × 150 = ₺54,000 tied-up stock; 3% monthly cost of capital₺1,620/month

The cost of a late order is one-off but can repeat; the cost of an excess order arises anew every month and, if the product does not sell, turns into dead stock. For managing dead stock, see how to clear dead stock. You can calculate the true cost of a stockout with how to calculate stockout cost. In multichannel selling, showing stock to channels is a separate topic: see how to prevent overselling on marketplaces.

Lesson 8: How is the reorder point monitored?

In short: Track five indicators monthly: number of products below the point, number of products out of stock, days of coverage, lead time deviation and the date the point was updated.

IndicatorHow it is calculatedSample value
Products below the pointNumber of products with stock position ≤ point2 of 3 products
Products out of stockNumber of products whose stock hit zeroTarget: 0
Days of coverageStock position ÷ Daily salesX: 10.4 days
Lead time deviationActual − Planned lead timeY: +2 days means the safety margin is reviewed
Update dateDate of the last calculationEvery three months
Takeaways from the exampleThe four numbers of the reorder point example
  • 144 unitsProduct X's reorder point
  • 125 unitsProduct X's stock position (below the point)
  • 271 unitsorder quantity for Product X
  • 216 unitsProduct X's new point during the campaign

Recalculate the point at least every three months, because the sales rate and lead time change. When you receive a critical stock notification, do not stop at placing the order; also check whether the point is still correct. To add the reports to the weekly management report, you can use the format in how to prepare a weekly management report. We explained what to look for when choosing inventory software in how to choose inventory tracking software.

Recommended ReadingHow to Measure the Order Fill Rate: Line, Order and Unit-Based Rates, Reasons for Missing Lines, Value of Lost Sales, Count Discrepancies, Channel Stock Delays and the Path to the Target Guide

What are the most common mistakes when calculating the reorder point?

  1. Looking at stock counted on the shelf. If orders in transit and pending orders are not taken into account, decisions are wrong.
  2. Taking lead time only from the supplier. Shipping, goods receipt and shelving are also part of the time.
  3. Not adding a safety margin. When supply is late, stock runs out.
  4. Including campaign days in the rate. The point comes out higher than it should be and too much stock is bought.
  5. Including out-of-stock days in the rate. Days when sales were impossible make the rate look low.
  6. Calculating the point once and leaving it. The sales rate and lead time change.
  7. Applying the same rule to all products. The point for a fast product and a slow product should be calculated with the same logic but separately.

How does NetKasam make reorder point tracking easier?

  • Critical stock alert. You enter the reorder point as the product's critical stock quantity; when stock drops to that quantity you get a notification and start the supply process before the product runs out (inventory management).
  • Stock movements report. You derive the sales rate from the detailed stock movements report.
  • Multiple warehouses. You see branch and warehouse stock instantly and calculate the total stock position (branch and warehouse management).
  • Variant management. You track the stock of unlimited variants separately; you can define a point per size and color.
  • Marketplace integration. Stock drops automatically with the order and current stock is passed on to the channels (marketplace integration).
  • Saved reports. You save the report of products below the point and export it to Excel (reports).
  • Bookkeeping is free. e-Invoice, customer and supplier accounts, inventory, cash, bank and expense management are free in every plan; see the pricing page for details.

Mini quiz: Test what you have learned

In short: Answer the 5 questions below, then compare with the answer key. 4 or 5 correct shows you have completed the training.

  1. What is the daily sales rate of a product that sold 672 units in 56 days?
  2. If daily sales are 12, the average lead time is 9 days and the longest lead time is 12 days, how many units is the safety margin?
  3. What is the reorder point of the same product?
  4. If on hand is 150, in transit is 0 and pending orders are 25, what is the stock position?
  5. If daily sales rise to 18 (lead time 9, longest 12 days), what is the new reorder point?

Answer key:

  1. 672 ÷ 56 = 12 units.
  2. (12 − 9) × 12 = 36 units.
  3. 12 × 9 + 36 = 108 + 36 = 144 units.
  4. 150 + 0 − 25 = 125 units.
  5. Safety margin (12 − 9) × 18 = 54; point 18 × 9 + 54 = 216 units.

Frequently Asked Questions About the Reorder Point

What is the reorder point?

It is the stock level at which a supplier order should be placed when stock falls to that quantity. It is the sum of the units that will be sold during the lead time and the safety margin.

How is the reorder point calculated?

The daily sales rate is multiplied by the average lead time and the safety margin is added. For example, at 12 units per day and a 9-day lead time, with a 36-unit safety margin the point is 144 units.

How is the safety margin found?

The average lead time is subtracted from the longest lead time and the result is multiplied by the daily sales rate. If sales fluctuate, the statistical safety stock method can be used.

What is the stock position?

It is the quantity found by adding on-hand stock and orders in transit and then subtracting pending orders reserved for customers. The ordering decision is made on this quantity.

How is the order quantity determined?

The target stock level is calculated: daily sales × (lead time + order interval) + safety margin. The stock position is subtracted from it, and the result is rounded according to the supplier's minimum quantity.

Does the point change during a campaign?

Yes. When the sales rate rises, both the sales during lead time and the safety margin rise. Before a campaign, the point is recalculated for the new rate.

How often should the reorder point be updated?

At least every three months, and also when the sales rate or lead time changes noticeably. It should also be calculated separately before campaigns and seasons.

Is a critical stock alert the same as the reorder point?

If you enter the reorder point as the critical stock quantity, it serves the same function: when stock drops to that quantity you get a notification and you start the ordering process.

Conclusion: Place the order when stock hits the point, not when it runs out

The most useful thing you can do today is to find the daily sales of your five best-selling products over the last eight weeks and the lead time of the last three orders. Then calculate the reorder point and enter it as the critical stock quantity. For a product that has hit the point, check the stock position and place the order; recalculate the points three months later.

Bookkeeping Is Now Completely Free

Manage your bookkeeping and e-Invoice operations with NetKasam without paying a thing. Customer and supplier accounts, inventory, collections and more in one panel, completely free.

Start FreeInventory Tracking

Read similar articles

19 free tools

Commission, shipping, VAT and profit calculations in your browser, no sign-up needed.

All tools